Skip to content

Artifact 1 · two on-ramps

Buy from DITCO. Connect through SNAP. They are not the same ticket.

A signed task order with no SNAP identity cannot connect. A CPTC with no CLIN cannot pay the IL. Sequence them. Some hops can run together. The gold hops cannot.

Process

DAPPS builds the package. CAO issues CPTC. Parallel until the gate.

Two DISA lanes. Buy is not connect. Gold hops are gated.
  1. DITCO or your KOBuy
  2. parallelNeed / PWS
  3. parallelDAPPS / HaCC
  4. parallelCompete four primes
  5. gatedTask order
  6. gatedCLIN live
    Can start nowNeed / PWSExisting PWS, IGCE, or JWCC intake form.
    Can start nowDAPPS / HaCCDraft acquisition package, or the HaCC tracking number.
    Can start nowCompete four primesSolicitation, fair-opportunity memo.
    GatedTask orderAwarded TO number, CLIN, prime, period.
    GatedCLIN liveInvoice / console org that can spend.
  1. DISN CAO / SCCA PMOConnect
  2. parallelSNAP account
  3. parallelC-ITP named
  4. gatedADD (IATT or ATO)
  5. gatedSNAP package
  6. gatedCPTC → BCAP
    Can start nowSNAP accountDD 2875, SNAP userid. Annual Cyber Awareness cert.
    Can start nowC-ITP namedUII / investment name, boundary drawing.
    GatedADD (IATT or ATO)Signed letter. IATO is gone.
    GatedSNAP packageTopology App E, CSSP, consent to monitor.
    GatedCPTC → BCAPCPTC memo, SCCA onboarding ticket.
p1Can run togetherPWS, SNAP 2875, PA service list, C-ITP charter, ICAM federation metadata. None of these wait on the TO.
p2GatedTO before spend. ADD before SNAP submit. CPTC before SCCA engineers BCAP. IATT before testers occupy.

Not this

A signed task order with no SNAP identity cannot connect.

  • Not One ticketA signed TO with no SNAP identity cannot connect.
  • Not Thunderdome as connectUsers can arrive SASE. Cloud to DISN still BCAP.
  • Not Cairn submitting DAPPSWe name the lane. We do not buy it.

If they share

We score the lane they already have. We do not submit it.

If they already hold it on this laptop — we read. We do not file it.
ShareAwarded JWCC TOBuy lane is live. Connect lane may not have started.
ShareSNAP userid / 2875Someone can register. The C-ITP may still be unnamed.
ShareCPTC memoCAO approved connect. BCAP may still be in engineering.
ShareNothingName the two owners. That is the first artifact.

Phase Zero

Two owners. Two lanes. Walk into the right office.

Phase Zero artifact
Leave with the sponsor

Two owners named. Buy lane sequenced from DITCO. Connect lane sequenced from SNAP. Parallel hops marked. Gated hops marked.

Awareness, not performance

Walk into the right office with the right object. We do not submit DAPPS or register SNAP.

Make them aware of what is needed. Do not perform it — unless they already hold the artifact.