Skip to content

Working with DISA

Five desks. Two on-ramps. A PA is not a connection.

Sponsors stall when they treat DISA as one window. Authorization of the offering, permission to connect, the boundary stack, how people arrive, and the bill are different tickets — sometimes different agencies.

Desks

Authorization, connection, boundary, arrival, and the bill.

Five desks. Walk into the right office with the right object.
DISA DCCSPA on the CSOProvisional Authorization: this Cloud Service Offering may host DoD missions at a named IL. Service-by-service, in DCAS.Not: Your mission ATO. Reciprocity for the application.
SNAP / DISN CAOPermission to connectRegisters the Cloud IT Project. Reviews the package. Issues Cloud Permission to Connect (CPTC).Not: The JWCC task order. The landing zone.
SCCA PMOEngineers the CAPAfter CPTC, engineers BCAP/ICAP. Optional VDSS/VDMS is extra. TCCM is a person you name.Not: Thunderdome. The security stack inside your VPC unless you placed it.
Thunderdome PMOHow people arriveZero Trust access plane: ICAM, SASE, SD-WAN, CESS. Accelerates arrival. Site survey is real.Not: The JWCC landing zone. The ATO. 152/152 for this system.
DITCO / your KOBuy the CLINJWCC task order via DAPPS / HaCC. A bill that can pay the IL this fiscal year.Not: A DISA authorization. DITCO is contracting, not the PA office.

Two on-ramps

A signed task order with no SNAP identity cannot connect.

Buy is not connect. Sequence them.
DITCO or your KOBuyNeed → DAPPS → compete four primes → task order → CLIN live.
SNAP / CAO / SCCAConnectC-ITP named → PA check → ADD (IATT or ATO) → SNAP → CPTC → BCAP.

Not this

We name the artifact. We do not register SNAP.

  • Not One windowA PA letter does not connect you. A CLIN does not authorize you.
  • Not Thunderdome as occupancyUsers can arrive SASE. Cloud to DISN still BCAP.
  • Not Cairn submitting SNAPWe name the artifact. We do not register it.

Phase Zero

Walk into the right office.

Phase Zero artifact
Leave with the sponsor

On-ramp RACI: KO, SNAP PO, CSP TAM, ISSM. Two lanes sequenced. Desks named.

Awareness, not performance

Phase Zero leaves the sponsor able to walk into the right office with the right object.

Make them aware of the desk. Do not submit the package unless they already hold it.