The vehicle · not the landing
JWCC lets you order from a prime. It does not put you in the cloud.
A task order is a catalog and a bill — IaaS, PaaS, SaaS, marketplace software, labor, and edge if that prime listed them. Landing zones, connections, and authorizations are separate work. Hygiene first. Occupancy is the point.
What you can order
Six families. Direct from the CSP. Not a reseller.
Three lists
On the TO. On the PA. First occupancy. Do not collapse them.
Not this catalog
Commercial SKU parity is a hope. DCAS is the check.
- Not Commercial SKU parityGovCloud / Azure Government / Assured folder / Defense Cloud is a shorter list. Confirm the CSO.
- Not Every CSO at every IL'All classification levels' is the vehicle goal. Secret and TS exist on JWCC. This kit stops at IL5.
- Not Marketplace as PAThe 3P mod lets ecosystem software ride the bill. Reciprocity is still DCAS.
- Not The follow-on as this CLINUnified Cloud Marketplace / JWCC Next is the successor. First occupancy is the Dec 2022 vehicle.
7 Dec 2022 · multiple-award IDIQ · AWS, Microsoft, Google, Oracle
The task order is a catalog and a bill.
- Not Landing zoneControl Tower, Azure LZ, Assured folder, OCI tenancy — you still stand it up.
- Not SNAP / CPTCPermission to connect is a different DISA office than the KO.
- Not SCCA / BCAPThe circuit and the stack. Not a CLIN on the TO.
- Not ICAM federationThe person is not in the catalog.
- Not IATT / ATOThe AO signs. The CSP PA is not that signature.
- Not ThunderdomeAccess plane. Separate occupancy.
- Not Cloud IaC appliedDISA templates exist. Applying them is work.
- Not All four primes occupiedA TO on four vendors is four inheritances. First occupancy is one prime.
- Not The PA service listCatalog membership is not a DISA PA. Check DCAS.
Four primes · IL5 floor
Same vehicle. Four partitions. First occupancy is one.
DISA
Buy from DITCO. Connect through SNAP. They are not the same ticket.
The vehicle. A bill that can pay the IL this fiscal year.
Permission to connect the Cloud IT Project to DISN via BCAP. CPG Appendix C.
- Need / PWS
- DAPPS / HaCC package
- Compete the four
- Task order
- CLIN live
- C-ITP named
- CSO in DCAS at this IL
- IATT or ATO letter
- SNAP package
- CPTC → BCAP
The mission's cloud project SNAP registers — an application, enclave, data set, or service onboarded into a provisionally authorized CSO. Name it the same as the UII / investment name. Not the JWCC task order. Not the CSO. Not Thunderdome. Not twelve bases.
- C.1Initiate
- C.2PA check
- C.3Network hygiene
- C.4ADD
- C.5SNAP / SGS
- C.6CPTC
- C.7–C.8CAP
- C.9Onboard
Phase Zero launch
Five artifacts. Start DISA. Sit with the AO. Keep the road on the long paper.
- 1Two on-ramps, two owners
- 2PA service list vs first occupancy
- 3Named Cloud IT Project
- 4Three-column inheritance the AO can mark
- 5One-prime IATT constraint set
These five leave with the sponsor at the end of six weeks. They are enough to start DISA and to sit with the AO. They are not the 48-month road.
Factory, cATO, four landing zones, OSCAL, FinOps Run — those stay on the long paper. Launch does not wait for them.
JWCC Next / Unified Cloud Marketplace is the follow-on. First occupancy is this vehicle. Do not wait on the successor to name a CLIN.